Geotechnical & Environmental Drilling
![]()
|
|
PHASE I & II ENVIRONMENTAL ASSESSMENTS
GEOTECHNICAL DRILLING
TEST PITS
FOUNDATION RECOMMENDATIONS
|
Our boring operation consists of multiple types of drilling equipment varying in portability from a full size Mobil Drill B-58, to Mobil Drill Minuteman with a tripod mounted cathead. Test Pits are performed utilizing either backhoe or manual equipment. Prior to mobilization, every site is inspected to determine what equipment is appropriate, probable geo-technical conditions and any other unique site conditions. After client authorization the project is scheduled, usually between three and five business days. All work is performed as per client provided specifications, drawings and/or local building codes. When required , New York City Department of Buildings Controlled Inspections are performed by our licensed professional engineers and TR-1 documents will be provided. All reports are produced using the AutoCAD program and e-mail service is available. |
|
|
|
|
B-58 Drill Rig |
Backhoe used for test pits |
![]() |
|
The Tripod Mounted Cathead is our most portable rig. It can be assembled in areas such as basements or areaways where truck access is not possible. |
EMAIL: INFO@CEBOSS.COM